Design Overview

Design Overview Methodology

An overview of the system design and installation services we offer can be divided into 5 steps.
1. First contact
2. Site evaluation and system quote
3. Initiate project
4. System commissioning
5. System walk through/briefing

Before we begin the process of system design we need to ask about the electrical loads you plan to run from renewable sources.

Three main factors help us design and size a system to fit your specific needs.

1. Your electrical usage, as determined by your previous electrical bills if you are on the grid, or a load analysis if you are off-grid.
2. Available renewable resources (solar, wind, water or a combination of resources)
3. Your budget

On-grid - Kilowatt-hours (kWh) reflect your power usage. To size a system accurately, we like to take a year’s history of your usage, which can be obtained by reviewing your past bills.

Off-grid - complete a load calculation worksheet to provide the usage demand requirements.

First Contact: Give us a call or email. We will discuss your expectations, and what size and type of system will best meet your wants and needs. We will discuss price, mounting location and technique, utility rebates and incentives, what to expect from a system, and address any questions you may have.

Site Evaluation and Quote: If you are interested in pursuing a system, one of Renewable Energy Systems Associates may come to your house or business to identify suitable renewable energy generation systems locations, take measurements, evaluate your electrical setup, review a history of your electric usage (if available) and develop system estimates for your review and consideration. These estimates will include a financial analysis detailing average annual energy savings, payback period, estimated rebates, net costs, and return on investment.

To Initiate the Project the Client accepts the system design and system quote. A deposit is collected from the customer. Renewable Energy Systems will prepare system drawings and utility documents, initiate any applicable building permits from the proper authorities, and begin procurement of installation materials and major system components. Upon arrival in Alaska of all required Installation materials and system components we will schedule delivery with system owner or his installation contractor. Upon receipt of all ordered materials, the remaining balance for system components and materials is due from customer. In the event we are performing the installation then we move into the final three phases...
 

Typical System Construction Timeline and Payment Schedule where we are providing the installation services:

Construction Schedule Timeframe Payment Schedule
Project Initiation   Day 1 15% deposit (of total project cost) required to initiate system design, permitting and engineering.
Design, Engineering, Permits    1 to 2 months after project deposit depending on municipality and utility   Upon completion, and prior to ordering major components the first progress payment is required. This payment is generally 20% of the total project cost.
Delivery of Installation materials and system components 2.5 to 3 months after deposit Upon the completion of the system installation and successful inspection by the building inspector or system owner/agent the second progress payment is required. This amount is equal to the sum of the initial deposit and progress payment one minus the total system cost.
Installation phase Varies, but typically 1-3 days from delivery of components As negotiated by customer with our service department for the labor. Typically 50% of labor charge is billed before installation.
Inspection & Commissioning. 3.5 to 4 months after deposit   System Commissioning: After installation is complete and all electrical inspections have occurred, We will test various system components for safe operation, generate system documentation for the end user and commission the system.
Customer Walk Through and Acceptance A full walk through of the system is done prior to or after commissioning. System operation guidelines and maintenance issues are addressed with client. The System Operations Manual is presented and an optional maintenance contract is offered to the client. Customer accepts system and final payment is made.

If you have any questions or comments regarding our Design / Build Process or would like to make an appointment to discuss a project with Renewable Energy Systems, please e-mail us at sales@renewableenergysys.com or call our office at (907) 561-7941.

 

Contact us by Phone (907)561-7941, Fax (907)561-7946, Email or U.S. Postal Mail 145 West Dimond, Anchorage, AK, 99515